Realizing a new pipeline corridor had to secure linkage for future pipelines between the Port of Antwerp and the German Ruhr area. A pipeline corridor with an average minimal width of 70m and an estimated length of approximately 129m up to 177m will assure the global position of the Antwerp (petro)chemical cluster, and will create optimal conditions regarding an expected transition towards sustainable resources (such as carbon transport by pipeline).
Indieners: Port of Antwerp, Antea Group